Notice of acceptance for consideration of an application for direct negotiations

The Ministry of Ecology and Natural Resources of the Republic of Kazakhstan announces a competition to identify a private partner for the PPP project «Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River»

PPP Project Name: «Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River»

PPP Project Objectives: Construction and operation of a cascade of hydroelectric power stations to ensure long-term and sustainable development of the centralized power supply and water supply system of the Turkestan region

PPP Project Goals:

  • Meeting the needs of the population in providing access to central water supply and electricity sources;
  • Development of energy infrastructure, increasing energy and environmental security of the region’s energy supply;
  • Application of know-how and optimal equipment from a technical, economic and environmental point of view.

Main Technical and Economic Parameters of the PPP Project:

NameUnitAmount
Exchange nodepcs5
Operation roadkm39,8
Overhead lines 10 kWkm32,0
Overhead lines 35 kWkm4,43
Overhead power lines 110 kWkm50,8
Rock and earth dampcs2
Reservoir Hydroelectric Power Station-1  
water area, when normal retaining level 1158,0 mkm22,89
filling volumes, Wusefulmln m326,45
Reservoir Hydroelectric Power Station-2  
water area, when normal retaining level 1105,0мkm20,91
filling volumes, Wusefulmln m33,91
Diversion tunnel d=5,4mkm12,73
Group water supply d=1,4 m, 2 wayskm41,0
Reservoir capacity 1400 m3pcs2
Switch chamberspcs13

Main criteria for the effectiveness of a PPP Project:

Name of IndicatorsUnitHPP-1HPP -2HPP -3HPP -4HPP -5Total
Installed power, NHPPMW501044472
Average annual electricity production, ЭHPPGW*h58,342,529,030,730,2190,8
Drinking water supplymln м3 / year     110

As a result of the construction of a group water pipeline, 6 districts of the Turkestan region will be provided with drinking water in a volume of 110 million m3 per year. Also, to reduce the electricity shortage in the southern zone of the country, a cascade of 2 hydroelectric power stations on the river. Ugam and 3 hydroelectric power stations on the water pipeline with an installed capacity of 72 MW will generate 190,9 GWh of environmentally “clean” electricity for consumers.

Planned time frame for implementation of the PPP Project: 25 years, including

Investment stage – 2023–2027

Post-investment stage – 2028–2047

Deadline for consideration of proposals and comments: 45 calendar days from date of publication

Procedure for submitting proposals and comments: a potential private partner submits an application to initiate direct negotiations in accordance with Chapter 4 of Order No. 725 of the Acting Minister of National Economy of the Republic of Kazakhstan dated November 25, 2015.

Proposals for requests for expressions of interest in this Project should be submitted to:: Republic of Kazakhstan, Astana city, Mangilik el ave. 8, House of Ministries, entrance 14